Skip to main content
Fig. 7 | Journal of NeuroEngineering and Rehabilitation

Fig. 7

From: Auto detection and segmentation of daily living activities during a Timed Up and Go task in people with Parkinson’s disease using multiple inertial sensors

Fig. 7

Time difference between visual and auto segmentation time during 5 m TUG. a-g ΔTave defines the time differences between the average segmentation time obtained using the IMUs and the average times marked by two independent examiners (in milliseconds) of all twelve participants during a 5 m TUG. h Shows the average differences in the transition time across the seven transition points during a TUG. Across the seven transitions, the average difference in the timestamp identified by the IMUs and the visual segmentation was 453 (±135) ms

Back to article page