Skip to main content

Table 6 Full results of Probabilistic sensitivity analysis

From: Budget impact analysis of robotic exoskeleton use for locomotor training following spinal cord injury in four SCI Model Systems

 

Mean (SD)

95% CI

Facility A

 Current cost

318,727.09 (38,750.52)

244,101.81, 396,054.92

 Future cost

319,901.66 (37,082.70)

248,223.86, 392,349.78

 Difference

1174.56 (13,552.87)

−23,305.15, 30,106.35

Facility B

 Current cost

340,331.06 (39,527.96)

264,223.77, 418,017.98

 Future cost

340,533.79 (37,800.31)

266,498.82, 414,476.83

 Difference

202.73 (13,430.07)

−24,508.92, 28,976.15

Facility C

 Current cost

355,740.28 (39,565.62)

279,999.34, 432,895.62

 Future cost

354,493.63 (37,927.97)

280,420.54, 428,026.15

 Difference

− 1246.65 (13,663.67)

− 26,749.97, 27,183.83

Facility D

 Current cost

318,888.07 (39,101.88)

242,958.61, 395,990.05

 Future cost

320,508.13 (37,354.01)

247,590.25, 393,909.77

 Difference

1620.06 (13,422.23)

− 7404.26, 31,122.70

  1. CI Credible Interval